Main content
Perma Cool ethanol chilling system in a clean industrial facility

Direct Refrigerant Ethanol Chilling

Perma Cool BLAST™ Ethanol Pre-Chiller Series

Flash chill ethanol to −40 °C and keep extraction moving.

BLAST Product Lineup

Not just a chiller, full turnkey chilling solutions.

One system, 3 dimensional solution.

Process sideRefrigeration sideControl side
Perma Cool BLAST 60/45 chilling tank assembly with two separate small condensers against snow-covered mountains

Compact Production

BLAST 60/45

Company installation records show more than 200 Legacy ACP-30 units placed in the field. The BLAST 60/45 is the updated evolution of that platform, built for demanding extraction environments with modernized controls and serviceability.

60 gallons45 minutes30-gallon centrifuge workflow
  • Flash-chill 60 gallons of room-temperature ethanol down to −40 °C in 45 minutes. You can run less.
  • Fast pull-down to target low-temp process windows.
  • Designed with readily available parts to keep repairs fast and affordable.
View BLAST 60/45
BLAST 150/45 ethanol chilling system

Mid-Scale Production

BLAST 150/45

A strong fit for teams that need commercial-scale ethanol chilling with fast pull-down, repeatable re-chill performance, and room to support growing production schedules.

150-gallon process classDirect refrigerant architecturePLC/HMI visibility
  • Designed for high-throughput ethanol extraction.
  • Fast pull-down to target low-temp process windows.
  • Designed with readily available parts to keep repairs fast and affordable.
View BLAST 150/45
BLAST 150/30 ethanol chilling system

High-Speed Mid-Scale

BLAST 150/30

A high-speed 150-gallon cascade system designed for five gallons per minute of flash chilling and reliable operation in demanding ambient conditions.

150 gallons30 minutes5 GPM cascade system
  • 22 HP primary refrigeration with a dedicated 6 HP cascade subcooling stage.
  • Regenerative chilling increases useful heat-transfer surface.
  • Mirage 1.0 PLC control connects the outdoor, control, and process zones.
View BLAST 150/30
BLAST 240/45 ethanol chilling system

Large Process Class

BLAST 240/45

A strong fit for teams that need commercial-scale ethanol chilling with fast pull-down, repeatable re-chill performance, and room to support growing production schedules.

240-gallon process classHVAC condenser integrationCompressor protection logic
  • Designed for high-throughput ethanol extraction.
  • Fast pull-down to target low-temp process windows.
  • Designed with readily available parts to keep repairs fast and affordable.
View BLAST 240/45
Core Performance Profile

Purpose-built chilling for extraction-ready ethanol.

  • −40 °C operationRapid purpose-built hot-to-cold chilling from room temperature to −40 °C.
  • Increase solution saturationEnables processors to reach biomass-to-ethanol ratios up to 3:1.
  • Increase speed, accuracy, and efficiencyRe-chill and re-extract at −40 °C with repeatable process control.
  • Make more moneyDitch LN2 and dry ice consumables and move cooling spend into planned utility operation.
  • Built to feed multiple centrifugesDrastically increase your BLAST with a BLAST chiller, then double that with a second centrifuge.
  • High pull-down speedDesigned for fast chilling cycles in commercial production environments.
  • PLC + HMI controlOn-screen monitoring, compressor protection, and clearer system visibility.
  • HVAC condenser integrationEfficient direct chilling architecture built to reduce operational overhead.
Whole Chilling Solution

NOT JUST A CHILLER - A WHOLE CHILLING SOLUTION

For the cost of what you normally pay for just a chiller.

Direct refrigerantDirect refrigeration horsepower

Applied refrigeration capacity is built into the chilling architecture and sized around the specified process load.

Rapid pull-downPurpose-built process side

A process-side design built around heat exchange surface area, contact, and pull-down speed from the start.

PLC + HMIIntegrated control side

On-screen monitoring, compressor protection, and clearer system visibility built into the chilling package.

Why BLAST Changes Extraction Flow

Chill, Extract, Repeat

Workflow Breakdown Article

Chill

Purpose-built direct refrigeration gives the BLAST series fast, repeatable pull-down without relying on a continuous supply of cryogenic consumables. Final performance is confirmed against the specified batch size, starting temperature, utilities, and operating conditions.

Fast pull-down without recurring cryogenic supply

Extract

Built to re-chill and re-run ethanol between extraction cycles. Some workflows target biomass-to-ethanol ratios up to 3:1, but achievable ratios and downstream recovery depend on material, equipment, SOP, and product requirements.

Workflow target: up to 3 lb biomass per gallon

Repeat

For facilities planning around multiple centrifuges or expanded extraction capacity, Perma Cool can help scope a BLAST configuration matched to flow rate, utility profile, and uptime requirements.

  • Configured around throughput goals
  • Supports scaling beyond single-line production
  • Built around real process constraints

Application Fit

Built for teams scaling ethanol extraction capacity.

Botanical extraction facilities scaling beyond pilot throughput.

Teams transitioning from LN2-heavy cooling operations.

Operators prioritizing predictable batch temperature control.

Operational Advantage

Turn reliable process cooling into higher extraction throughput.

The Perma Cool BLAST Ethanol Pre-Chiller Series is purpose-built for ethanol extraction labs that need fast, on-demand direct chilling from room temperature to −40 °C. Engineered as a true BLAST chiller from the condensing through the process side, it helps processors increase throughput, reduce LN2 dependency, and optimize their extraction workflow.

Frequently Asked Questions

QUESTIONS?

Contact Us — Ask a Question

What temperature range do Perma Cool ethanol chillers target?

Typical process targets include operation down to approximately −40 °C depending on system configuration and facility conditions.

Why choose direct refrigerant chilling over LN2?

Direct refrigerant systems can lower recurring consumable costs while delivering stable, repeatable process cooling for extraction lines.

How quickly can this be deployed?

Lead times vary by configuration; Perma Cool aligns scope early to reduce procurement friction and commissioning surprises.

Your system, your process

We’ll help you work through these four key decisions.

Learning Center

Practical extraction cooling guidance for better system decisions.

Compare chilling methods, reduce LN2 dependency, and plan system fit with practical guides built for extraction operators.

Visit Learning Center